• Overview
  • Map
  • Characters
  • Races
  • Classes
  • Factions
  • Monsters
  • Items
  • Spells
  • Quests
  • One-Shots
  • Game Master
  1. World of Redemption
  2. Lore

Train Schedule Travel Guide

Southern and Eastern Railway Schedule

This is the detailed schedule for the Southern and Eastern Railway. The train cannot travel backward on the track.

  • St. Denis Station → Annesburg Station: approximately 5 days.

  • Annesburg Station → Bacchus Station: approximately 2 days.

  • Bacchus Station → Wallace Station: approximately 2 days.

  • Wallace Station → Riggs Station: approximately 2 days.

  • Riggs Station → Flatneck Station: approximately 2 to 3 days.

  • Flatneck Station → Rhodes Station: approximately 3 to 4 days.

  • Rhodes Station → St. Denis Station: approximately 3 to 4 days.

Total Loop Time: Approximately 19 to 22 days.

Central Union Railroad Schedule

The Central Union Railroad line operates a loop around Ambarino, New Hanover, and Lemoyne. The train cannot travel backward on the track. This train carries both cargo and passengers.

  • St. Denis Hub → Van Horn Station: approximately 3-4 days.

  • Van Horn Station → Annesburg Station: approximately 1 day.

  • Annesburg Station → Bacchus Station: approximately 2 days.

  • Bacchus Station → Wallace Station: approximately 2 days.

  • Wallace Station → Riggs Station: approximately 2 days.

  • Riggs Station → Valentine Station: approximately 1-2 days.

  • Valentine Station → Heartland Oil Fields Station: approximately 1 day.

  • Heartland Oil Fields Station → Emerald Ranch Station: approximately 1 day.

  • Emerald Ranch Station → St. Denis Hub: approximately 4-5 days.

Total Loop Time: Approximately 17 to 20 days.

Southwestern Railroad Schedule

This local line operates out of MacFarlane's Station with two distinct routes. The train does not stop at switches or turnarounds.

Benedict Point Loop: This is the main passenger and cargo route for the region. Travel times are measured in days to maintain consistency with other major lines.

  • MacFarlane Station → Armadillo: approximately 1.5 days

  • Armadillo → Benedict Point Station (via Left Switch): approximately 2 days

  • Benedict Point Station → Armadillo (via Right Switch): approximately 2 days

  • Armadillo → MacFarlane Station: approximately 1.5 days Total Loop Time: Approximately 7 days

Stillwater Creek Spur: This is a short industrial spur line. The round trip is brief and measured in hours.

  • MacFarlane Station ↔ Stillwater Creek (Round Trip): Approximately 2 hours

Lannahechee and Midland Railroad Schedule

The Lannahechee and Midland Railroad makes a loop around the outer edges of Ambarino, New Haven, and Lemoyne. The train cannot travel backward on the track. This line only carries cargo.

  • St. Denis Hub → Annesburg Station: approximately 5 days.

  • Annesburg Station → Bacchus Station: approximately 2 days.

  • Bacchus Station → Wallace Station: approximately 2 days.

  • Wallace Station → Riggs Station: approximately 2 days.

  • Riggs Station → Flatneck Station: approximately 2 to 3 days.

  • Flatneck Station → Rhodes Station: approximately 3 to 4 days.

  • Rhodes Station → St. Denis Hub: approximately 3 to 4 days.

Total Loop Time: Approximately 19 to 22 days.