This is the detailed schedule for the Southern and Eastern Railway. The train cannot travel backward on the track.
St. Denis Station → Annesburg Station: approximately 5 days.
Annesburg Station → Bacchus Station: approximately 2 days.
Bacchus Station → Wallace Station: approximately 2 days.
Wallace Station → Riggs Station: approximately 2 days.
Riggs Station → Flatneck Station: approximately 2 to 3 days.
Flatneck Station → Rhodes Station: approximately 3 to 4 days.
Rhodes Station → St. Denis Station: approximately 3 to 4 days.
Total Loop Time: Approximately 19 to 22 days.
The Central Union Railroad line operates a loop around Ambarino, New Hanover, and Lemoyne. The train cannot travel backward on the track. This train carries both cargo and passengers.
St. Denis Hub → Van Horn Station: approximately 3-4 days.
Van Horn Station → Annesburg Station: approximately 1 day.
Annesburg Station → Bacchus Station: approximately 2 days.
Bacchus Station → Wallace Station: approximately 2 days.
Wallace Station → Riggs Station: approximately 2 days.
Riggs Station → Valentine Station: approximately 1-2 days.
Valentine Station → Heartland Oil Fields Station: approximately 1 day.
Heartland Oil Fields Station → Emerald Ranch Station: approximately 1 day.
Emerald Ranch Station → St. Denis Hub: approximately 4-5 days.
Total Loop Time: Approximately 17 to 20 days.
This local line operates out of MacFarlane's Station with two distinct routes. The train does not stop at switches or turnarounds.
Benedict Point Loop: This is the main passenger and cargo route for the region. Travel times are measured in days to maintain consistency with other major lines.
MacFarlane Station → Armadillo: approximately 1.5 days
Armadillo → Benedict Point Station (via Left Switch): approximately 2 days
Benedict Point Station → Armadillo (via Right Switch): approximately 2 days
Armadillo → MacFarlane Station: approximately 1.5 days Total Loop Time: Approximately 7 days
Stillwater Creek Spur: This is a short industrial spur line. The round trip is brief and measured in hours.
MacFarlane Station ↔ Stillwater Creek (Round Trip): Approximately 2 hours
The Lannahechee and Midland Railroad makes a loop around the outer edges of Ambarino, New Haven, and Lemoyne. The train cannot travel backward on the track. This line only carries cargo.
St. Denis Hub → Annesburg Station: approximately 5 days.
Annesburg Station → Bacchus Station: approximately 2 days.
Bacchus Station → Wallace Station: approximately 2 days.
Wallace Station → Riggs Station: approximately 2 days.
Riggs Station → Flatneck Station: approximately 2 to 3 days.
Flatneck Station → Rhodes Station: approximately 3 to 4 days.
Rhodes Station → St. Denis Hub: approximately 3 to 4 days.
Total Loop Time: Approximately 19 to 22 days.