Bara api world illustration - Post-Apocalyptic theme
Post-Apocalyptic

In 2070, a zombie virus threatens mankind. A futuristic, dystopian, cyberpunk test of survival!

Played3 times
Cloned0 times
Created
37 days ago
Last Updated
15 days ago
VisibilityPublic
Main Filtration Plant
Main Filtration Plant
Point of Interest
Details
Coordinates(456, 476)
Description

The Main Filtration Plant, a labyrinth of steel and concrete, hums with the relentless churn of purification. It's the city's lifeblood, where the meager water sources are forced through layers of filtration, removing contaminants and the lingering traces of the collapse. Towering tanks, rusted pipes, and hissing machinery dominate the space, a testament to salvaged technology and desperate ingenuity. The air is thick with the metallic tang of treated water and the ever-present threat of sabotage. Heavily armed Hegemony guards patrol the perimeter, their vigilance a constant reminder of the plant’s strategic importance. This facility, a prize in the Aqueduct Wars, is more than a water purifier; it’s a symbol of Hydro Hegemony's absolute control, a fortress against both the thirsting city and rival factions.

Appearance

The plant features massive steel structures, rusted pipes snaking through the air, and large water tanks that glisten under the harsh industrial lights. Guard towers and barricades are strategically placed, giving it a militarized look.

This work includes material taken from the System Reference Document 5.1 (“SRD 5.1”) by Wizards of the Coast LLC . The SRD 5.1 is licensed under the Creative Commons Attribution 4.0 International License.
We are not affiliated with Dungeons & Dragons or Wizards of The Coast in any way.
© 2025 Friends & Fables
Privacy PolicyTerms of Service